Mr Beaver’s Data Center Disruption Tactics

Happy Beaver

Beaver Vandalism

Krrzztt

Data Center B[lack] Out

2 Weeks, 3 power outages of up to 6 hours, and counting. Thanks Mr Beaver. Thanks Pacific Power for putting the power lines that feed this area along the Columbia River Slough.

Pretty much all I’ve done is help systems and processes recover from power outages.  (Oh, like you have every system on power filtering UPS’s with automatic generator cutover and a lifetime supply of generator fuel even when it doesn’t make economic sense.) We’ve only lost one PC and one disk, so far. It could be worse, some of the airport landing lights are on the same circuit and have no backup power at all. The power company is now rerouting the power lines away from the beaver.

Photo Credits:

Blogged with the Flock Browser

Tags: , ,

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: